Codecom CCX – MPO Cassette Installation

Codecom CCX – MPO Cassette Installation Video
This is a demonstration video of how to install 24 fibre MPO CCX Cassette.
IMPORTANT: It is critical that all parts and fibres are cleaned prior to installation
Stage one:
Insert the cassette into the allocated slots within the panel.
Stage two:
Remove the dust caps.
Stage three:
Plug the MPO connectors into the allocated ports.
Stage four:
Route the cables into the above cable management and insert the protective cover.
Related articles
- Video

Codecom Rack Solutions
Codecom have a wide range of products designed for in-rack applications.
FEB 4 2021
- Video

Infrastructure Masons arrives in Australia
Leading industry association Infrastructure Masons launched in Australia last week, with several kick-off events on the Gold Coast.
MAR 23 2020
- Video

Codecom CCX – Ribbon Fibre Installation
This video will demonstrate how to splice into the CCX 24 fibre ribbon splice cassette.
MAY 17 2019